Commissioning

Commissioning is the final phase of bringing a robot cell into production — installing, configuring, testing, and proving it meets cycle time and quality.

Commissioning is the structured process of bringing a robot cell from installed hardware to validated production: powering up, configuring the controller and I/O, teaching or loading programs, tuning, and running acceptance tests against agreed criteria.

Commissioning typically includes a factory acceptance test (FAT) before shipment and a site acceptance test (SAT) after installation, proving the cell meets cycle time, quality, and safety targets. Operator training and documentation handover close the phase.

Budget commissioning time and cost when planning a project around a used robot — it is where real-world part variation, fixturing, and signal timing are resolved into a stable cell.